We successfully executed the LV panel shutdown work at LOOTAH Tower, which involved the safe isolation of power, removal and replacement of faulty components, cable termination, and necessary modifications within the LV panel. All work was carried out during a planned shutdown window, ensuring minimal disruption to building operations. The team followed strict safety protocols and completed the task efficiently, restoring the system to full operational condition within the scheduled timeframe.